Risk Management · 2024
In this section2 topics
Risk Management Policy & Plan
Policy & Plan Description
The Company has established a systematic enterprise-wide risk management policy by setting up a Risk Management Committee to be responsible for developing policies, establishing systems, and assessing various risks arising from both external factors and internal management and operations, as well as determining guidelines for managing and controlling risks to an acceptable level. The Company communicates and organizes training seminars and workshops for employees to raise awareness of the importance of risk management. The Company's risk management process is as follows:
1. Establishing Risk Management Policies and Criteria
It is the establishment of policies, objectives, scope, responsibilities, criteria, and risk management guidelines to be consistent with the strategies, goals, plans, and business directions. The Company will review them annually and will proceed with the business plan to ensure consistency.
2. Risk Identification
Identifying risks that may affect the achievement of objectives and goals by considering risks arising from internal and external factors such as the environment, laws, finance, information systems, decision support systems, investor satisfaction, investment management, human resources, reputation, security systems, etc. The Company will manage risks by considering risk ranking before considering control systems. If the risks are in the high and very high categories, the Company will analyze those risks for management first.
3. Risk Analysis
Analysis to assess the level of residual risk after assessing existing control systems and prioritizing risks. If the residual risk remains high or very high, risk management measures must be defined immediately by the responsible senior management. If the residual risk is moderate or low, management measures should be defined at the departmental level or corrected in the operating process.
4. Risk Management
Defining the method of preparing a plan to manage significant risks as prioritized in the risk analysis process. Risk management can be done in several ways, such as control, risk transfer, risk avoidance, risk exploitation, or risk acceptance.
5. Monitoring and Evaluation
The process of monitoring risk management results according to the defined plan, including evaluating the effectiveness of risk management, which the Risk Management Committee will monitor and report to the Executive Committee, Audit Committee, and Board of Directors.
Risk Factors for the Company's Business Operations
In 2024, the Company assessed the risks that may affect its business operations. The key risks can be classified as follows:
1. Strategic Risks (Business Sustainability)
• Risks from revenue fluctuations from projects
Since the past, the Company has been operating a business providing engineering consulting services and design and construction work, focusing on investment projects in various infrastructure and public utility systems, such as transportation, road networks, public transportation systems, rail, air, water, and pipeline transportation systems, development of logistics management standards that facilitate and enhance transportation efficiency, development of major cities, oil depots, as well as other projects that are in line with the development and progress of the country. One of the factors affecting investment in the country's infrastructure and public utility systems is the economic situation, government policies and plans for infrastructure development, and the government's budget disbursement plan. If there is a slowdown in the economic situation or investment climate, both from a slowing or recessionary economy, as well as the stability of the government, if there is a change of government and new policies, the disbursement of the budget for investment in public utilities or the government's infrastructure development plan is delayed or postponed, as well as increased competition in the industry, these factors may cause the target projects that the Company expects to receive but is not selected by the project owner, resulting in the risk that the Company will have uneven revenue every year, as most of the Company's projects have a duration of 1-3 years, which may cause the Company to have a decrease in service revenue and may affect the operating results in each accounting period.
The Company recognizes such risks as they have a significant impact on the Company's operating results. The Company has assigned the Executive Vice President of Business Development to monitor the political situation and private sector investment situation, as well as report to the management team on a regular basis for timely planning and response to the situation. In addition, the Company closely monitors the government's national development policies, annual budget allocations of ministries and departments, and analyzes them to develop strategies to obtain work from target agencies, monitors procurement regulations, and proposes adjustments to the Company's procurement regulations accordingly. The Company also has a policy to expand its business to other markets, including the private sector, foreign countries, especially CLMV countries, as well as developing new target business sectors, such as real estate, industrial, and agricultural sectors, etc.
In addition, the Company has set a plan to invest in the construction and provision of public-private partnership (PPP) infrastructure systems and has a strategy to acquire PPP projects, which will result in sustainable revenue for the Company by seeking strategic partners who are subcontractors with experience in specialized infrastructure construction to enhance the Company's ability to expand its business.
• Risks from competition
The Company has competitors who provide engineering consulting services, who are skilled and experienced and are credible in the engineering consulting industry in participating in bidding for work, especially for the government sector. In addition, there is also the possibility of new competitors emerging in the engineering consulting market, as skilled personnel in engineering and other fields form new companies to compete in the market, which may lead to price competition. The Company's competitors may submit bids at lower prices, resulting in the Company not being awarded the work as expected, or the increased competition may cause the Company to be awarded work with a lower gross profit margin than the specified criteria.
However, the Company has measures to manage competition risks by having the Business Development Department monitor news from existing customer groups, both private sector customers and state enterprise customers, to track new projects, as well as maintaining relationships with customers, maintaining the quality of work and after-sales service continuously to increase customer confidence, as well as approaching new target customer groups and customers from foreign countries, and seeking alliances with existing and new competitors that are assessed to have potential and are satisfactory to the agencies to jointly operate as a Consortium / Joint Venture.
For projects that are the Company's target projects, which are important projects with reasons and necessity for acceptance, and/or projects that can be extended to other projects, even if the gross profit margin is lower than the Company's policy, the Company will consider accepting such projects. The person in charge of the project will present it to the Executive Committee and the Board of Directors for consideration according to the Company's authorization.
In the normal course of business of engineering consulting and construction contracting, especially in projects related to infrastructure in which the Company specializes and which are the Company's main target group, the selection of contractors by project owners is primarily based on the capabilities and experience of the contractors. Those who do not have experience in the type of work specified by the project owner or have little experience in the work may not be considered for the job. Therefore, it can be said that the engineering consulting and construction contracting business, especially in projects related to infrastructure, has relatively high barriers to entry. However, the Company's experience in providing engineering consulting services for over 40 years, its personnel consisting of engineers, architects, specialists in various fields, and over 100 experienced employees, its diverse portfolio of over 300 projects, which has earned the trust and confidence of its customers, as well as the establishment of business alliances that help strengthen its experience, are all factors that enable the Company to compete and are considered strengths in the Company's business operations.
2. Operational Risks
• Risks from delays in project delivery beyond the contractually agreed upon timeframe due to external factors
In conducting engineering consulting and design and construction business, the Company is responsible for providing services and construction according to the needs and requirements of customers on a project-by-project basis and must deliver the work within the time specified in the contract. Due to the nature of such work, the Company is at risk of delivering the project later than scheduled due to changing external factors or unforeseen events such as epidemics, emerging diseases, natural disasters, changes in government laws and policies related to business operations. These factors may have a direct or indirect impact on the Company's operations, which may result in delays or even suspension of the project for a period of time. Therefore, if any of the aforementioned events occur, the Company will be at risk of not being able to recognize revenue from services as planned, which will affect liquidity management and the risk of impacting project costs from increased personnel costs, as well as the management of the Company's resources to support the work of the project, which may be delayed.
The Company recognizes the risks that may arise and has established a policy before deciding to accept a job. The Company will study and understand the details of the work, the nature of the project, and the scope of work for each project to analyze the feasibility of the project before accepting the job, including analyzing the specific risks of each project (Project Risk Management) to estimate the cost of the project at an appropriate price. In addition, after the Company has been hired by the project owner, the Company will assess the situation to plan and define contingency plans to be able to carry out the project and deliver the work within the contract period, as well as reporting the project status to the Company's management on a regular basis.
3. Reporting and Financial Risks
• Risks from cost estimation deviations for each project
As the Company recognizes revenue from services for each project based on the percentage of completion method, which is calculated from the ratio between actual cost compared to budget cost until the end of the project, such budget cost may deviate from the actual cost of providing services.
The Company recognizes the risks that may arise and has established guidelines for the analysis and assessment of cost and profit feasibility by experts before submitting bids and before signing contracts. The Company ensures compliance with the regulations for submitting proposals and considering work acceptance, and strictly follows the sales and business development manual in preparing cost estimates for use in project bidding. The Company also studies project information, analyzes the preliminary feasibility of the project, the benefits received, opportunities, and continuity of work, including analyzing risks in budget preparation to determine appropriate prices according to the nature of the work to present to the project owner, and defines risk as a cost throughout the project duration. The Company also considers distributing the risks that may arise to those involved in the work, such as subcontractors, insurance companies, etc. In addition, the Company has conducted a survey of the creditworthiness of project owners, especially in the case of private sector projects, where the Company will examine the financial statements of the company, as well as the readiness of personnel proposed to work on the project in terms of time and ability to complete the work.
4. Regulatory Risks
• Risks from changes in government laws and policies related to business operations
Due to the complexity of the provisions of relevant laws and regulations, as well as changes in policies, laws, regulations, and rules, as well as unclear interpretations and misunderstandings of expected practices, failure to comply or incomplete compliance may affect the cost of project implementation, the Company's image and reputation, as well as the impact in the event of penalties and fines, or loss of business opportunities.
The Company recognizes the risks that may arise and has established guidelines for management by closely monitoring changes in government policies, laws, regulations, and rules related to the Company's business operations through print media and government websites, and participating in networks of non-governmental organizations (NGOs) whose objective is to monitor the impact of changes in policies, laws, regulations, and rules that affect businesses and the general public, as well as controlling the framework and guidelines for establishing regulations, rules, and internal orders to be consistent with business operations without violating relevant laws and regulations.
5. Investment and Key Target Project Risks
• Risks from investing in businesses of other operators
As the Company aims to operate a business with continuous growth, generating revenue and wealth for the Company's shareholders in a stable and sustainable manner, investing in projects with other operators is another option that helps generate continuous and consistent revenue and increase the Company's assets. However, investing in projects with other operators may pose a risk of events occurring under the operations of such operators, which may have a significant impact on the Company's financial position, ability to operate, and operating results after the investment.
However, in order to mitigate such risks, before making any investment, the Company's internal units, together with external experts hired by the Company, will participate in due diligence in terms of legal, accounting, and engineering to assess opportunities and events that give rise to obligations and risks to the Company in the future, including securing funding before investing. In addition, the Company will closely monitor the business progress of the investee company and analyze potential risks to present to the Chief Executive Officer and consider them jointly at the monthly Executive Committee meeting.
• Risks from accepting major projects
In undertaking large and important projects of the Company, turnkey projects, such as the design and construction project for the U-Tapao Airport Aviation Fuel System, if there are risks under the project operation, it will have a significant impact on the Company. Therefore, in order to mitigate such risks, in accepting large and important projects, the Company will assess the risks comprehensively, both in terms of the process of defining agreements and guidelines for project management before starting construction, delays in approvals from government agencies and relevant agencies in applying for all construction permits, construction material prices, fuel prices, exchange rates, or even the spread of the Covid-19 virus at the construction site, causing construction to be halted. In addition, there will be presentations and meetings to closely monitor progress.
6. Emerging Risks
• Risks from the macro economy and political uncertainty
The Company's operating results and development plans may be affected by several external factors beyond its control, such as the global economic and inflationary conditions, soaring energy prices due to war and international conflicts, weak domestic consumption, and political instability. The Company recognizes the risks that may arise and has assigned the responsible management team to closely monitor and analyze the situation, strengthen its operations and operating systems, and diversify by expanding its business to other markets, including the private sector, foreign countries, especially CLMV countries, as well as developing new target business sectors, such as real estate, industrial, and agricultural sectors. In addition, the Company has developed a business continuity plan to ensure that departments are prepared in advance to cope with various events and can control them to an acceptable level.
• Risks related to compliance with the Personal Data Protection Act
Thailand has announced the Personal Data Protection Act B.E. 2562, which will come into force in May 2563, but the enforcement has been postponed since June 2565 onwards. The Company is involved with the personal data of various stakeholders of the Company, such as customers, partners, employees, etc. The Company has reviewed its work processes and improved information systems related to personal data by collecting only necessary and beneficial personal data from customers and partners. For employees, all employees must undergo training on compliance with the Personal Data Protection Act, etc., in order to establish measures in various aspects, including adjusting work practices, adjusting information technology systems, and changing policies and relevant legal documents to comply with the said law.
• Sustainability Risks (ESG Risk)
Sustainability risks are risks related to "ESG" or Environmental, Social, and Governance issues, also known as "ESG Risk". The Company places importance on this issue by integrating sustainability risk management from the vision and mission setting, including sustainability risk and materiality analysis, to incorporate risk management at all levels to build confidence among key stakeholders, such as
Environmental Risk Management, such as reducing carbon emissions that will affect climate change, managing sanitation systems and office waste within the head office and project offices of all projects, campaigning to control the use of electricity and fuel, to managing water resources.
Social Risk Management by taking into account occupational health and safety both within the office and at all project sites, prioritizing human rights, equality, racial diversity of the workforce, and maintaining personal data for the data security of personnel.
Corporate Governance Risk Management, such as prioritizing good governance, taking into account business ethics, anti-corruption , prioritizing relevant rules and regulations, strict compliance with tax laws, including having disciplinary measures in case of fraud that causes damage to the organization.
In 2024, the company assessed the employees' knowledge and understanding of anti-corruption at 84.95 percent.
Risks to the Company's Business Operations
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Strategic and Business Risks | 1. Strategic and Business Risks • Government policies Since the past, the company has operated a business providing engineering consulting services and design and construction work, focusing on investment projects in public utilities and infrastructure in various fields such as transportation, road networks, public transportation systems, rail, air, water, and pipeline transportation, development of logistics management standards to facilitate and increase transportation efficiency, main city development, oil depots, as well as other projects that are in line with the development and progress of the country. Factors affecting investment in public utilities and infrastructure in the country include economic conditions, government policies and infrastructure development plans, and government budget disbursement plans. In the event that the economic situation and investment climate slow down, both from a slowing or recessionary economy, including the stability of the government, if there is a change of government and new policies, the disbursement of the budget for investment in public utilities or the government's infrastructure development plan is delayed or postponed, as well as the competitiveness of the industry, there is increased competition. • Competitive risks / Increase in competitors / Easy entry of new traders The company has competitors who provide engineering consulting services, which are skilled and experienced and are trusted in the engineering consulting circle in participating in bidding for government projects in particular. In addition, there is also the possibility of new competitors in the engineering consulting market. This is due to the fact that professionals in engineering and other fields are forming new companies to compete in the market. 2. Management and Operational Risks • Future projects not going according to plan • Sustainability risks (ESG Risk) Sustainability risks are risks related to “ESG” or Environmental, Social, and Governance issues, also known as “ESG Risk”, which the company has placed importance on. This is done by integrating sustainability risk management from the vision and mission setting, including sustainability risk and materiality analysis, into risk management at various levels to build confidence among key stakeholders, such as environmental risk management, social risk management, and governance risk management. 3. Regulatory and Legal Risks • Changes in business regulations and laws Due to the complexity of the relevant legal provisions, including changes in policies, laws, regulations, and rules, as well as unclear interpretations and misunderstandings of expected practices, failure to comply or incomplete compliance may result in costs and expenses in project implementation, corporate image, and reputation. This includes the impact in the event of penalties and fines, or loss of business opportunities. 4. Financial Risks • Volatility of returns on assets or investments As the company aims to operate a business with continuous growth, generating revenue and prosperity for the company's shareholders in a stable and sustainable manner, participating in projects from other operators is another option that helps generate continuous and consistent revenue recognition and enables the company to have increased assets. However, participating in projects from other operators may pose a risk of events occurring under the operations of such operators, which may have a significant impact on the financial position, ability to operate the business, and operating results of the company after the investment. | 1. Strategic and Business Risks • Government policies Target projects that the company expects to receive but are not selected by the client, resulting in the risk of inconsistent revenue for the company each year. Most of the company's projects have a duration of 1-3 years, which may result in a decrease in revenue from services and may affect the operating results for each accounting period. • Competition risk / Increase in competitors / Ease of market entry for new traders This may lead to price competition, as the company's competitors may bid on projects at lower prices, resulting in the company not being awarded the projects as expected. Or, due to increased competition, the company may receive projects with gross profit margins lower than the specified criteria. 2. Management and Operational Risks • Future projects not proceeding as planned There is a risk of not being able to realize service revenue as planned, which will affect liquidity management. There is also a risk of impacting project costs due to increased personnel costs, as well as the management of company resources to support project operations that may be delayed. • Sustainability Risk (ESG Risk) Impacts from various factors that may cause economic, social, and environmental instability or unsustainability, which affect the ability to grow and develop sustainably in the future, including the impact of climate change. Greenhouse gas emissions from various activities cause an increase in global temperature and climate change, which may affect health, occupational safety, including the impact of non-compliance with relevant rules and regulations. 3. Regulatory and Legal Risks • Changes in regulations and laws related to business operations Affecting the costs and expenses of project implementation, the image and reputation of the company, including the impact in the event of penalties and adjustments, or loss of business opportunities. 4. Financial Risks • Volatility of returns on assets or investments May pose a risk of events occurring under the operations of such operators, which may significantly impact the financial position, ability to operate, and operating results of the company after the investment. | 1. Strategic and Business Risks • Government Policies The Company acknowledges this risk as it could significantly impact its operating results. Therefore, the Company has assigned the Executive Vice President of Business Development to monitor the political climate and private sector investment trends. Regular updates are provided to the executive committee to facilitate timely responses to the situation. Furthermore, the Company closely monitors the government's national development policies, annual budget allocations across ministries and departments, and conducts analyses to formulate strategies for securing projects from target agencies. The Company also keeps abreast of procurement regulations and proposes revisions to its own procurement regulations to ensure alignment. Additionally, the Company has a policy to expand its business into other markets, including the private sector and overseas markets, particularly the CLMV countries. This includes developing new target business sectors such as real estate, industrial, and agricultural sectors. Moreover, the Company has established an investment plan for the construction and provision of public infrastructure systems through Public-Private Partnerships (PPP). Strategies are in place to secure PPP projects, which will contribute to the Company's revenue sustainability. This involves seeking out strategic partners who are subcontractors with proven track records and expertise in specialized infrastructure construction, thereby enhancing the Company's capacity for business expansion. • Competition Risk / Increase in Competitors / Ease of Entry for New Market Entrants In the conventional engineering consulting and construction businesses, particularly for infrastructure projects where the Company specializes and focuses its core operations, the selection of contractors by project owners primarily hinges on the capabilities and experience of the bidders. Consequently, those lacking experience or with limited experience in the specific type of work required by the project owner may not be considered for the project. Therefore, the engineering consulting and construction businesses, especially in infrastructure-related projects, present significant barriers to entry for new competitors. Nevertheless, the Company's 41 years of experience in providing engineering consulting services, coupled with its team of over 100 experienced engineers, architects, specialists, and staff, has resulted in a diverse portfolio of over 300 projects. This track record has earned the Company the trust and confidence of its clients. Furthermore, the Company's strategic business partnerships have strengthened its expertise, further enhancing its competitive advantage and serving as a key strength in its business operations. 2. Management and Operational Risks • Future projects not proceeding as planned The Company recognizes the potential for such risks and has established a policy of conducting thorough due diligence before accepting any project. This involves studying and understanding the project details, characteristics, and scope of work for each project to analyze its feasibility. Additionally, project-specific risk assessments (Project Risk Management) are conducted to prepare accurate cost estimates at reasonable prices. Furthermore, after the Company is awarded a contract by a client, it will assess the situation to develop plans and contingency plans to ensure project execution and delivery within the stipulated timeframe. Regular progress reports are also provided to the Company's management. • ESG Risks Environmental risk management focuses on reducing carbon emissions that contribute to climate change. This includes implementing sanitation and waste management systems at the head office and all project sites, promoting energy conservation measures, and managing water resource utilization. Social risk management is carried out with consideration for workplace health and safety both within the office and across all project sites. Emphasis is placed on human rights, equality, workforce diversity, and the protection of personal data to ensure personnel information security. Governance risk management involves prioritizing good corporate governance by emphasizing ethical business conduct, combating corruption, adhering to relevant regulations, strictly complying with tax laws, and implementing disciplinary measures in cases of misconduct that result in damage to the organization. 3. Regulatory and Legal Risks • Changes in Business Regulations and Laws Recognizing the potential for such risks, the Company has implemented measures to monitor changes in government policies, laws, regulations, and notifications relevant to its business operations. This is achieved through monitoring print media, government websites, and active participation in non-governmental organizations (NGOs) focused on tracking the impact of policy changes, laws, and regulations affecting businesses and the public. The Company also ensures that its internal regulations, guidelines, and orders are aligned with its business operations and do not violate any relevant laws or regulations. 4. Financial Risks • Volatility in Investment Returns To mitigate this risk, before making any investment, the Company's internal team, in collaboration with external experts, conducts comprehensive due diligence. This includes legal, accounting, and engineering assessments to evaluate potential opportunities and events that could lead to future obligations and risks for the Company. Additionally, securing funding sources before making investments is prioritized. The Company also closely monitors the business progress of its investee companies and analyzes potential risks, which are then reported to the Chief Executive Officer and discussed at monthly Executive Committee meetings. | 756 · Description: Change in laws and regulations · Info category: COMPLIANCE_RISK · 730 · Description: Government policy · Info category: STRATEGIC_RISK · 765 · Description: Fluctuation in return on assets or investment · Info category: FINANCIAL_RISK · 746 · Description: Delays in the development of future projects · Info category: OPERATIONAL_RISK · 1714 · Description: Competition risk · Info category: STRATEGIC_RISK · 755 · Other name: ESG (Environmental, Social, and Governance) Risks · Description: Other · Info category: OPERATIONAL_RISK |